Goldman Sachs Dallas Campus at NorthEnd
Project Specs
Location: Dallas, TX
Architect: Corgan
General Contractor: Structuretone Southwest
Mechanical Engineer: Syska Hennessy
Completion Date: January, 1 2028
Project Description
800,000-sf, 14-story campus featuring two wings
Over 5,000 air distribution devices installed in the Raised Access Flooring (RAF) to provide under-floor air distribution system throughout the facility
Designed to house over 5,000 employees
Project Gallery
In the News
Goldman Sachs, along with Hunt Realty Investments and Hillwood Urban, broke ground on the campus at 2323 North Field Street in Dallas in 2023. It's slated to open in 2028. The building itself is composed of two wings, with the tallest being 14 floors, and will run entirely on electric energy. It will sit on roughly three acres on the southeast corner of the city's Northend Development. It also sits alongside a 1.5-acre urban park.
https://www.foxbusiness.com/economy/goldman-sachs-constructs-14-floor-texas-campus-fitness-center-childcare-facilities